The City of Astoria 2007 Wind
and Hydro Generation Study


Wind and Hydro Study Appendices

A. Detailed List of Parcel Ownership
B. Project Proforma Budget
C. Section 7.7 and 7.8 Tax Lot Details
D. Wind Turbine Specifications
E. Hydroelectric Equipment Specifications
F. Hydroelectric Cost Estimates
G. Preliminary Wildlife Assessment, J.M.Patterson
H. Big Creek Final Study, Todd Boswell
I. Nicolai-Wickiup Watershed Assessment E & S .Environmental Chemistry, Inc. and Nicolai Wickiup Watershed Council, 2000
J. Hydrologic Analysis Bear Creek Reservoir, Astoria, OR ...2007, Community Hydro, Plainfield, VT
K. Clatsop County Permitting Requirements
L. Hydroelectric Licensing
1) Understanding FERC Small Conduit Exemption Article
2) Integrated Licensing Process Flow Chart (Used for .Hydroelectric.License)
3) Guide to Developing Small/Low Impact Hydropower Projects
4) Exemptions From Licensing
5) Oregon Consultation List (FERC)
6) Minor Hydroelectric Application (Oregon Water Resources)

M. Interconnect Study (not completed at the time of publishing)

For more information,
email cmaynard@astoria.or.us
or reach us by phone at
(503) 338-5173
Fax us at: (503) 338-6538

Mail inquiries may be sent to:
Public Works Department
Astoria City Hall
1095 Duane Street
Astoria, OR 97103

 Funded by the Energy Trust of Oregon, Oregon Economic and Community Development Department, and Pacific Power

Study Coordinator 
Mike Morgan 
 
Engineering Study 
Stephen F. Anderson, P.E./Evergreen NRG 
Charlotte Rollier, M.S.A.E./Evergreen NRG 
Michael Maloney, PE/SOAR Technologies, Inc.
 
Preliminary Wildlife Assessment 
J.M. Patterson, Celata Research Associations 
 
Photography 

by Ken Nelson, Michael Maloney,  
Stephen Anderson, and J.M. Patterson 

Executive Publisher Kitty Paino